Upgrade of the existing casting machine PNG-7.5 in order to install a modern Siemens PLC control system, replace the oil station, mixer control system and water conduit equipment
RUS-Engineering LLC, RUSAL Krasnoyarsk JSC, Casthouse No. 2
2017
S7-1500 PLC control system
BOCSH based oil station
Mixer heating thyristor control
Unified control of all casting unit components