Upgrade of the system of lubrication feed to the molds of the casting machine in order to warp-up the oil tank and the pipe system in winter
RUS-Engineering LLC for “RUSAL Krasnoyarsk” JSC, Casthouse No.3
2017
Metal structures, power equipment and automatic manufacturing process drawings
Capacity of the oil tank is increased up to 40 liters
Heating, temperature and oil level control system
Heating of pipes before molds with self-regulating heating cable
The control panel with indication of control parameters